Skip to main content

Electronics Era

  • About Us
  • Advertise with Us
  • Contact Us
  • e-Mag
  • Webinars
Header logo on website
Advertisement
Advertisement
Menu
  • Home
  • News
    • Industry News
    • Product News
  • TECH ROOM
    • Sensor
    • VR / AR
    • Embedded
    • Medical Electronics
    • Industry 4.0
    • Robotic
    • Automation
    • Smart Machine
    • Component
    • MCU
    • Manufacturing
    • Security
    • Policy
    • Telecom
      • 5G/6G
  • Semiconductor
    • AUTOMOTIVE ELECTRONICS
      • EVs
      • HEVs
      • ADAS
      • Connected Cars
    • IoT-Internet of Things
      • Development Kit
      • IoT Design
    • Power Electronics
      • AC-DC/DC-DC Converters
      • Mosfets
      • IGBTs
      • LEDs
  • A & D
  • T & M
    • 5G testing
    • Oscilloscopes
    • SDN & NFV
    • RF & Wireless
  • AI/ML
  • RENEWABLES
    • Sustainability
    • Solar Magazine
  • Future Tech
    • Data Center
    • Cloud Computing
    • Big Data Analytics
  • Webinars
  • Editor’s Pick
    • Tech Article
    • Tech Blog
    • White Papers
    • EE-Tech Talk
    • Market Research
    • Videos
  • EE Awards
    • EE Awards 2025
    • EE Awards 2024
  • MORE
    • E-Mag
    • Events
    • MAGAZINE Subscription
    • Contact Us
Home Semiconductor Power Electronics

AmpereHour Powers IndiGrid’s 250 MW/500 MWh BESS Project in Rajasthan

Nimish by Nimish
November 18, 2026
in Power Electronics
Reading Time: 2 mins read
AmpereHour Energy

AmpereHour Energy Integrates IndiGrid’s 250 MW/500 MWh Rajasthan BESS

Share on FacebookShare on TwitterShare on LinkedIn

Mumbai – AmpereHour Energy, India’s technology-led Battery Energy Storage System (BESS) integrator, today announced its role as the BESS integration partner for IndiGrid’s recently commissioned 250 MW / 500 MWh standalone BESS project in Rajasthan. Located in western Rajasthan, the project is connected to the 765 kV Bhadla-III pooling substation and adds utility-scale energy storage capacity to the region’s power infrastructure.

With a power capacity of 250 MW and an energy storage capacity of 500 MWh, the facility can deliver its rated output for up to two hours. It is designed to store electricity when available and discharge it when required, supporting peak demand management and the integration of renewable energy into the grid.

AmpereHour Energy engineered and integrated the AC-coupled BESS, comprising modular 40 MWh / 20 MVA blocks and a centralised Power Plant Controller (PPC). The PPC coordinates system operations and supports applications such as peak shifting and frequency support. The plant is managed by AmpereHour Energy’s proprietary ELINA Energy Management System (EMS), which supports battery operations and coordination with state and regional load dispatch centres.

Commenting on the project, Mr. Rahul Shelke, Managing Director and Co-Founder, AmpereHour Energy, said: “Large-scale battery storage is about more than storing electricity; it is about making power available when the grid needs it most. Projects of this scale are an important step towards building a power system that can accommodate more renewable energy while responding to changing demand. We are pleased to have partnered with IndiGrid on this project, bringing our BESS integration expertise and proprietary energy management technology to support the deployment of utility-scale storage infrastructure in India.”

Mr. Harsh Shah, Managing Director, IndiGrid, further added: “As renewables take a larger share of India’s power mix, battery storage is rapidly moving from the fringes to the core of the country’s long-term power planning, enabling RE integration while keeping the grid stable. The commissioning of our 250 MW / 500 MWh project in Rajasthan, our third BESS project, is an important milestone for IndiGrid and reflects the work that goes into translating energy storage plans into operating infrastructure. We extend our appreciation to AmpereHour Energy for their partnership and consistent support in taking this project across the line.”

The commissioning adds to India’s growing deployment of standalone battery energy storage, as the country builds the infrastructure needed to support a power system with an increasing share of renewable generation.

Tags: AmpereHour EnergyIndiGrid
Nimish

Nimish

Join Our Newsletter

* indicates required
Electronics Era

Electronics Era, India's no.1 growing B2B news forum on Electronics and Cutting Edge Technology is exploring the editorial opportunity for organizations working in the Electronics Manufacturing Services(EMS) Industry.

Follow Us

Browse by Category

  • 5G testing
  • 5G/6G
  • AC-DC/DC-DC Converters
  • ADAS
  • AEIS
  • Aerospace & Defence Electronics
  • AI/ML
  • Automation
  • AUTOMOTIVE ELECTRONICS
  • Big Data Analytics
  • Blockchain
  • Cloud Computing
  • Component
  • Connected Cars
  • Data Center
  • Editor's Desk
  • EE-Tech Talk
  • Electronics Components
  • Embedded
  • EVs
  • Future Tech
  • HEVs
  • Industry 4.0
  • Industry News
  • IoT Design
  • IoT-Internet of Things
  • LED & Lighting
  • LEDs
  • Manufacturing
  • Market Research
  • MCU
  • Medical Electronics
  • Mosfets
  • News
  • Oscilloscopes
  • Policy
  • Power Electronics
  • Product News
  • RENEWABLES
  • RF & Wireless
  • Robotic
  • SDN & NFV
  • Security
  • Semiconductor
  • Sensor
  • Smart Machine
  • SMT/PCB/EMS
  • Sustainability
  • T & M
  • Tech Article
  • Tech Blog
  • TECH ROOM
  • Telecom
  • Uncategorized
  • VR / AR
  • White Papers

Recent News

AmpereHour Energy

AmpereHour Powers IndiGrid’s 250 MW/500 MWh BESS Project in Rajasthan

November 18, 2026
ASMPT

ASMPT SMT Solutions Expands its SIPLACE V Platform

November 18, 2026
  • About Us
  • Advertise with Us
  • Contact Us

© 2022-23 TechZone Print Media | All Rights Reserved

No Result
View All Result
  • Home
  • News
    • Industry News
    • Product News
  • TECH ROOM
    • Sensor
    • VR / AR
    • Embedded
    • Medical Electronics
    • Industry 4.0
    • Robotic
    • Automation
    • Smart Machine
    • Component
    • MCU
    • Manufacturing
    • Security
    • Policy
    • Telecom
      • 5G/6G
  • Semiconductor
    • AUTOMOTIVE ELECTRONICS
      • EVs
      • HEVs
      • ADAS
      • Connected Cars
    • IoT-Internet of Things
      • Development Kit
      • IoT Design
    • Power Electronics
      • AC-DC/DC-DC Converters
      • Mosfets
      • IGBTs
      • LEDs
  • A & D
  • T & M
    • 5G testing
    • Oscilloscopes
    • SDN & NFV
    • RF & Wireless
  • AI/ML
  • RENEWABLES
    • Sustainability
    • Solar Magazine
  • Future Tech
    • Data Center
    • Cloud Computing
    • Big Data Analytics
  • Webinars
  • Editor’s Pick
    • Tech Article
    • Tech Blog
    • White Papers
    • EE-Tech Talk
    • Market Research
    • Videos
  • EE Awards
    • EE Awards 2025
    • EE Awards 2024
  • MORE
    • E-Mag
    • Events
    • MAGAZINE Subscription
    • Contact Us

© 2022-23 TechZone Print Media | All Rights Reserved

Advertisement
Advertisement