Electronics Era

  • About Us
  • Advertise with Us
  • Contact Us
  • e-Mag
  • Webinars
Header logo on website
Advertisement
Advertisement
Menu
  • News
    • Industry News
    • Product News
  • TECH ROOM
    • Sensor
    • VR / AR
    • Embedded
    • Medical Electronics
    • Industry 4.0
    • Robotic
    • Automation
    • Smart Machine
    • Component
    • Manufacturing
    • Aerospace & Defence
    • Security
    • Policy
  • Semiconductor
    • AUTOMOTIVE ELECTRONICS
      • EVs
      • HEVs
      • ADAS
      • Connected Cars
    • IoT-Internet of Things
      • Development Kit
      • IoT Design
    • Power Electronics
      • AC-DC/DC-DC Converters
      • Mosfets
      • IGBTs
      • LEDs
  • T & M
    • 5G testing
    • Oscilloscopes
    • SDN & NFV
    • RF & Wireless
  • AI/ML
  • Telecom
    • 5G/6G
  • RENEWABLES
    • Sustainability
  • Future Tech
    • Data Center
    • Cloud Computing
    • Big Data Analytics
  • Webinars
  • Editor’s Pick
    • Tech Article
    • Tech Blog
    • White Papers
    • EE-Tech Talk
    • Market Research
  • EE Awards
    • EE Awards 2025
    • EE Awards 2024
  • MORE
    • E-Mag
    • Events
    • Subscription
    • Contact Us
Home Future Tech Data Center

How to Protect Data Center Cooling Systems During Construction

Editorial by Editorial
March 25, 2023
in Data Center
Reading Time: 3 mins read
data center
Share on FacebookShare on TwitterShare on LinkedIn

Our ever-increasing reliance on technology means that the construction of data centers continues to boom, with market growth expected to continue in the foreseeable future. Growing right along with that is the need for cooling systems to dissipate the heat generated by thousands of servers processing data 24 hours a day. But what happens in the interim between cooling system installation and data center startup? The following two corrosion inhibiting technologies are great strategies for keeping cooling water systems in like-new, corrosion-free condition during hydrotesting and dry layup.

Hydrotesting with VpCI®-649
Cooling water systems and any piping network designed to handle fluids must be hydrotested to check for leaks and pressure durability before they are ever used. Unfortunately, this critical step also leaves behind residual moisture that can incite corrosion and related problems before operation ever starts. This can lead to clogging in pipes and chillers at startup or even deterioration and leakage of the system wall if left undetected. An easy solution is to add VpCI®-649 to the hydrotest water. VpCI®-649 combines contact and Vapor phase Corrosion Inhibitors in a liquid formulation that does not contain nitrites, phosphates, or chromates. Treated hydrotest water can be captured and reused for multiple hydrotests on different pieces of equipment. Those also facing molybdate restrictions can opt for VpCI®-649 MF, which uses a PTSA tracer (in place of molybdate) for easy detection of corrosion inhibitor concentration. As VpCI®-649 circulates through the system in the hydrotest water, it leaves behind a corrosion inhibiting film that continues to protect the piping after the system is drained. No further removal is needed before commissioning. 

Dry Layup of Chiller Bundles and Other Isolated Chambers
After the chiller has been installed but prior to piping completion, larger, isolated void areas like the chiller bundle should undergo dry layup with the Cooling Tower Frog®. This Cortec® water treatment “animal” consists of a water soluble bag containing Vapor phase Corrosion Inhibitor powder. The product is very easy to apply, with little or no surface preparation required. Once the bags are placed in the end of the chiller bundle or other enclosed area, the film should be slit open to release the corrosion inhibiting vapors before closing all openings to the void area. As time passes, these Vapor phase Corrosion Inhibitors diffuse throughout the enclosed space, adsorbing on metal surfaces in the form of a protective molecular layer that inhibits the corrosion reaction, even in the presence of moisture. To make life even better for the commissioning crew, there is no need to remove the Cooling Tower Frog® at the end of the layup period. When the chiller is turned on and cooling water is flushed through the system, the Cooling Tower Frog® will simply dissolve in the makeup water.

Faster and Better Data Center Construction
Design and construction of data centers is getting easier and faster as builders learn from past experiences and create new blueprints to follow. The use of VpCI®-649 and the Cooling Tower Frog® for corrosion protection in cooling systems is just one more insight to make the process more efficient than ever by preserving chill water systems in their original state and eliminating unnecessary corrosion complications at startup. Contact Cortec® to learn more about this groundbreaking approach to a critical part of data center construction: https://www.cortecwatertreatment.com/contact-us/

Tags: Cooling Tower Frogcooling water systemscorrosion inhibiting technologiesdata center constructiondata center cooling systemsdry layup of chiller bundleshydrotestingmolybdate restrictionsVapor phase Corrosion InhibitorsVpCI-649
Editorial

Editorial

Join Our Newsletter

* indicates required
Electronics Era

Electronics Era, India's no.1 growing B2B news forum on Electronics and Cutting Edge Technology is exploring the editorial opportunity for organizations working in the Electronics Manufacturing Services(EMS) Industry.

Follow Us

Browse by Category

  • 5G testing
  • 5G/6G
  • AC-DC/DC-DC Converters
  • ADAS
  • Aerospace & Defence
  • AI/ML
  • Automation
  • AUTOMOTIVE ELECTRONICS
  • Big Data Analytics
  • Blockchain
  • Cloud Computing
  • Component
  • Connected Cars
  • Data Center
  • Editor's Desk
  • EE-Tech Talk
  • Electronics Components
  • Embedded
  • EVs
  • Future Tech
  • HEVs
  • Industry 4.0
  • Industry News
  • IoT-Internet of Things
  • LED & Lighting
  • LEDs
  • Manufacturing
  • Market Research
  • Medical Electronics
  • Mosfets
  • News
  • Oscilloscopes
  • Policy
  • Power Electronics
  • Product News
  • RENEWABLES
  • RF & Wireless
  • Robotic
  • SDN & NFV
  • Security
  • Semiconductor
  • Sensor
  • Smart Machine
  • SMT/PCB/EMS
  • Sustainability
  • T & M
  • Tech Article
  • Tech Blog
  • TECH ROOM
  • Telecom
  • Uncategorized
  • VR / AR
  • White Papers

Recent News

MIKROE

What’s in your Water? Check with TDS Click from MIKROE

June 16, 2025
Wika India

Sustainability in Electronics Manufacturing: Strategies for a Greener Future

June 16, 2025
  • About Us
  • Advertise with Us
  • Contact Us

© 2022-23 TechZone Print Media | All Rights Reserved

No Result
View All Result
  • News
    • Industry News
    • Product News
  • TECH ROOM
    • Sensor
    • VR / AR
    • Embedded
    • Medical Electronics
    • Industry 4.0
    • Robotic
    • Automation
    • Smart Machine
    • Component
    • Manufacturing
    • Aerospace & Defence
    • Security
    • Policy
  • Semiconductor
    • AUTOMOTIVE ELECTRONICS
      • EVs
      • HEVs
      • ADAS
      • Connected Cars
    • IoT-Internet of Things
      • Development Kit
      • IoT Design
    • Power Electronics
      • AC-DC/DC-DC Converters
      • Mosfets
      • IGBTs
      • LEDs
  • T & M
    • 5G testing
    • Oscilloscopes
    • SDN & NFV
    • RF & Wireless
  • AI/ML
  • Telecom
    • 5G/6G
  • RENEWABLES
    • Sustainability
  • Future Tech
    • Data Center
    • Cloud Computing
    • Big Data Analytics
  • Webinars
  • Editor’s Pick
    • Tech Article
    • Tech Blog
    • White Papers
    • EE-Tech Talk
    • Market Research
  • EE Awards
    • EE Awards 2025
    • EE Awards 2024
  • MORE
    • E-Mag
    • Events
    • Subscription
    • Contact Us

© 2022-23 TechZone Print Media | All Rights Reserved

Advertisement
Advertisement