Skip to main content

Electronics Era

  • About Us
  • Advertise with Us
  • Contact Us
  • e-Mag
  • Webinars
Header logo on website
Advertisement
Advertisement
Menu
  • Home
  • News
    • Industry News
    • Product News
  • TECH ROOM
    • Sensor
    • VR / AR
    • Embedded
    • Medical Electronics
    • Industry 4.0
    • Robotic
    • Automation
    • Smart Machine
    • Component
    • MCU
    • Manufacturing
    • Security
    • Policy
    • Telecom
      • 5G/6G
  • Semiconductor
    • AUTOMOTIVE ELECTRONICS
      • EVs
      • HEVs
      • ADAS
      • Connected Cars
    • IoT-Internet of Things
      • Development Kit
      • IoT Design
    • Power Electronics
      • AC-DC/DC-DC Converters
      • Mosfets
      • IGBTs
      • LEDs
  • A & D
  • T & M
    • 5G testing
    • Oscilloscopes
    • SDN & NFV
    • RF & Wireless
  • AI/ML
  • RENEWABLES
    • Sustainability
    • Solar Magazine
  • Future Tech
    • Data Center
    • Cloud Computing
    • Big Data Analytics
  • Webinars
  • Editor’s Pick
    • Tech Article
    • Tech Blog
    • White Papers
    • EE-Tech Talk
    • Market Research
    • Videos
  • EE Awards
    • EE Awards 2025
    • EE Awards 2024
  • MORE
    • E-Mag
    • Events
    • MAGAZINE Subscription
    • Contact Us
Home Editor's Desk Tech Article

When a Power Converter Passes Emissions but Fails in the Field

By: Keyhan Sheshyekani, PhD

Vishaka Vardhan by Vishaka Vardhan
October 24, 2026
in Tech Article
Reading Time: 4 mins read
Share on FacebookShare on TwitterShare on LinkedIn

A power converter might perform quietly during testing but still fail in real-world conditions where nearby radio transmitters, industrial drives, or switching systems operate. It’s easy to overlook the difference: emissions testing evaluates what interference a product emits, while immunity testing examines how it responds to external interference. Success in one does not guarantee success in the other.

This distinction is crucial for EV chargers, battery systems, solar inverters, motor drives, and medical power supplies. Although their power stages may be durable, the low-voltage circuitry that controls them depends on sensor signals, communication links, and precisely timed switching commands. Even a brief disturbance at any of these interfaces can alter the entire system’s behavior.

Follow the path into the converter

Interference affects equipment mainly in two ways. Conducted susceptibility occurs when unwanted signals travel along cables into power, control, or communication ports. Radiated susceptibility happens when electromagnetic fields reach the equipment through space, coupling into its enclosure, circuit board, or external wiring.

These pathways often overlap. For example, a field can induce current in a motor cable, which then carries that current through a connector to a controller. Similarly, a cable might pick up a common-mode signal, resulting in a differential error at a sensor input if the conductors or return paths are unbalanced. This causes the controller to interpret a faulty measurement.

When investigating immunity failures, understanding whether the disturbance entered through the DC bus, a current-sense lead, an Ethernet cable, or a gap in the enclosure is more useful than simply noting the frequency at which the product ceased functioning. The appropriate fix depends on this information.

Test the functions that matter

RF immunity is typically tested by coupling a controlled signal onto relevant cables, using either a coupling/decoupling network or an injection clamp, depending on the standard and interface. Alternatively, radiated immunity testing involves exposing the product to a controlled RF field. The specific standard applicable determines the methods, test levels, and acceptance criteria; for example, IEC 61000-4-6 and IEC 61000-4-3 cover basic conducted and radiated RF immunity testing. During testing, the converter should actively perform its functions, as idling or no-load conditions may not reveal faults that occur under load, such as during acceleration. An inverter might maintain its output voltage even if communications drop repeatedly. A charger might recover after RF exposure but could lose a stored fault record. Merely monitoring whether the unit stays powered on may overlook failures like false protections, sensor drift, unintended switching, loss of regulation, or communication issues. Before testing, clearly define operating modes, connected cables, loads, software versions, and essential functions to maintain. Document what constitutes unacceptable events to provide meaningful feedback to both the design and compliance teams.

Fix the coupling path, then retest

It’s tempting to simply add a larger filter or a thicker shield when a susceptibility peak is observed. While this approach can be effective, it may also mask the true cause or shift the problem to a different frequency. The actual performance of a filter depends on parasitic elements and impedances at both connections. Shielding effectiveness relies on details such as connector bonds, seams, and cable penetrations, which can be more critical than the enclosure material itself.

A more effective process involves first reproducing the fault, then determining which function is affected, and isolating the probable entry path. Practical steps include measuring or inspecting cable currents and sensitive ports. Next, implement a specific adjustment: improve connector shield termination, filter the sensor line near its entry, correct a return path, or reduce an exposed PCB loop. After making changes, repeat the test under the same cable layout and operating conditions. Multiple simultaneous modifications can obscure which one fixed the issue.

Formal EMC testing is most valuable when the test plan aligns with the customer’s intended installation. Cable lengths, grounding, enclosure design, and load conditions are vital engineering considerations, not mere administrative details.

Consider the market and the radio at the same time

A connected converter raises a key design issue: will its wireless subsystem function properly during switching of the power stage and in the presence of external RF fields? Radio performance and EMC immunity address different potential failures. Conducting RF and wireless tests along with converter EMC testing can reveal interactions among the antenna, digital controls, cabling, and switching hardware while design adjustments are still feasible.
For products aimed at Europe, early identification of relevant legislation and harmonised standards is essential. CE Marking EMC testing can provide supporting technical evidence, but the manufacturer is responsible for the overall conformity assessment and declaration. Requirements differ depending on the product and whether it includes radio equipment.

The engineering lesson is clear: immunity depends on the complete operating system. Test the converter with its actual cables, loads, and controls; analyze how interference affects critical functions; and test each correction under consistent conditions. This approach ensures that a passing test on paper translates into reliable performance in use.

Tags: Power Converter
Vishaka Vardhan

Vishaka Vardhan

Join Our Newsletter

* indicates required
Electronics Era

Electronics Era, India's no.1 growing B2B news forum on Electronics and Cutting Edge Technology is exploring the editorial opportunity for organizations working in the Electronics Manufacturing Services(EMS) Industry.

Follow Us

Browse by Category

  • 5G testing
  • 5G/6G
  • AC-DC/DC-DC Converters
  • ADAS
  • Aerospace & Defence Electronics
  • AI/ML
  • Automation
  • AUTOMOTIVE ELECTRONICS
  • Big Data Analytics
  • Blockchain
  • Cloud Computing
  • Component
  • Connected Cars
  • Data Center
  • Editor's Desk
  • EE-Tech Talk
  • Electronics Components
  • Embedded
  • EVs
  • Future Tech
  • HEVs
  • Industry 4.0
  • Industry News
  • IoT Design
  • IoT-Internet of Things
  • LED & Lighting
  • LEDs
  • Manufacturing
  • Market Research
  • MCU
  • Medical Electronics
  • Mosfets
  • News
  • Oscilloscopes
  • Policy
  • Power Electronics
  • Product News
  • RENEWABLES
  • RF & Wireless
  • Robotic
  • SDN & NFV
  • Security
  • Semiconductor
  • Sensor
  • Smart Machine
  • SMT/PCB/EMS
  • Sustainability
  • T & M
  • Tech Article
  • Tech Blog
  • TECH ROOM
  • Telecom
  • Uncategorized
  • VR / AR
  • White Papers

Recent News

EVs

Smart Energy Management & AI in EVs: How Industry Giants Are Redefining the Future of Electric Mobility

October 24, 2026
LESOL

An Exclusive Interaction with Mr. Naman Shah, MD and CEO LeSol Group

October 24, 2026
  • About Us
  • Advertise with Us
  • Contact Us

© 2022-23 TechZone Print Media | All Rights Reserved

No Result
View All Result
  • Home
  • News
    • Industry News
    • Product News
  • TECH ROOM
    • Sensor
    • VR / AR
    • Embedded
    • Medical Electronics
    • Industry 4.0
    • Robotic
    • Automation
    • Smart Machine
    • Component
    • MCU
    • Manufacturing
    • Security
    • Policy
    • Telecom
      • 5G/6G
  • Semiconductor
    • AUTOMOTIVE ELECTRONICS
      • EVs
      • HEVs
      • ADAS
      • Connected Cars
    • IoT-Internet of Things
      • Development Kit
      • IoT Design
    • Power Electronics
      • AC-DC/DC-DC Converters
      • Mosfets
      • IGBTs
      • LEDs
  • A & D
  • T & M
    • 5G testing
    • Oscilloscopes
    • SDN & NFV
    • RF & Wireless
  • AI/ML
  • RENEWABLES
    • Sustainability
    • Solar Magazine
  • Future Tech
    • Data Center
    • Cloud Computing
    • Big Data Analytics
  • Webinars
  • Editor’s Pick
    • Tech Article
    • Tech Blog
    • White Papers
    • EE-Tech Talk
    • Market Research
    • Videos
  • EE Awards
    • EE Awards 2025
    • EE Awards 2024
  • MORE
    • E-Mag
    • Events
    • MAGAZINE Subscription
    • Contact Us

© 2022-23 TechZone Print Media | All Rights Reserved

Advertisement
Advertisement